Benefit-Cost Analysis (BCA) is a method that determines the future risk reduction benefits of a hazard mitigation project and compares those benefits to its costs. The result is a Benefit-Cost Ratio (BCR). A project is considered cost-effective when the BCR is 1.0 or greater. Applicants and subapplicants must use FEMA-approved methodologies and tools—such as the BCA Toolkit—to demonstrate ....